Madeira Beach after the storms
Madeira Beach runs from the Redingtons south to John's Pass, with Gulf-front condos on one side of Gulf Boulevard and canal neighborhoods on the bay side. More than 100 people have filed for demolition permits here since the storms (ABC Action News).
Many of the bay-side streets are lined with older single-story homes that took surge water in 2024. Empty lots and new raised homes now sit between houses still waiting on repairs.
Madeira Beach homes and lots
Small block and frame homes from the 1950s through the 1970s, duplexes and older cottages, many on canal lots with docks. Tight streets and small lots make access and debris staging part of every estimate.
Most-requested demolition in Madeira Beach
- House Demolition
Older bay-side homes past repair.
- Pool Removal
Pools damaged by surge on canal lots.
- Lot Clearing & Debris Removal
Lots cleared for sale or a rebuild.
Permits and paperwork for Madeira Beach
The City of Madeira Beach Building Department handles demolition permits for Madeira Beach addresses. The office is at 300 Municipal Drive, Madeira Beach, FL 33708, (727) 391-9951 (Pinellas County building-department directory).
Separately, Pinellas County Air Quality requires a demolition notice with a written asbestos survey at least 10 working days before demolition, even when no asbestos is found (county asbestos rules). The licensed contractor files both.
Plan the dumpster spot
Narrow streets and small lots leave little room for roll-off containers. Ask where the dumpster and equipment will sit before the work starts.
Madeira Beach demolition checklist
- City of Madeira Beach permit and tree check
- Dumpster placement on a narrow street
- Dock and seawall excluded
- Neighbors' fences protected
Get a written price for your Madeira Beach property.
Free estimateMadeira Beach demolition questions
Who issues demolition permits in Madeira Beach?
The City of Madeira Beach Building Department, 300 Municipal Drive, (727) 391-9951.
Do I need a permit to remove trees in Madeira Beach?
Yes. The city requires a permit before removing any tree, including on private property.
How long does a Madeira Beach teardown take?
Paperwork and the county's 10-working-day notice take a few weeks; the teardown itself is usually one to three days.
More beach towns and nearby cities
- Treasure IslandVacant homes ruled substantially damaged.
- St. Pete BeachRebuilds on pilings need the slab gone.
- Redington ShoresHomes torn down to meet flood rules.
- Redington BeachHomes restored inside after flooding.
- GulfportLow-lying homes near Boca Ciega Bay.
- Pinellas ParkManufactured homes in parks.
On the mainland: St. Petersburg demolition.

